Global searching is not enabled.
Skip to main content
Page

Maintenance of Augers (Screw Conveyors)

Completion requirements
View

The maintenance of screw conveyors prior to grain reception or during normal plant operation should focus on checking, inspection, servicing, repair or replacement of the following components:

Trough or Tube

Check for any signs of wear or holes especially on the underside of the tough or tube; grain or dust leakages especially at joints.

Repair as appropriate – consider welding as a temporary measure.

Tighten bolts and nuts.

Trough Cover

Check that the cover is dust-tight, weather proof and secure.

Check and replace missing bolts and nuts.

Check that the inspection safety hatch with micro-switch is functioning.

Hollow Shaft Screw

Check and inspect if the shaft screw turns freely, check whether the shaft screw is deflecting between support bearings.

Check condition of ribbon/blade and bearings.

Check, tighten/replace loose/missing shaft interconnecting pins.

Drive Station Clean and check motor, drive mechanism, i.e. v-belts tension or couplings, gear box for lubricants levels and grease, guards and meters.
Feed device Check that adjustment for feed device is functioning properly.
General Check and ensure that all supports are firm and properly secured.